How to evaluate charger procurement timeliness? build a practical standard using qidasun's fulfillment data
When purchasing chargers, delivery time directly impacts inventory turnover and final delivery to customersshenzhen qidas network technology co., ltd. (1688 store "shenzhen qida technology") the collection rate in the past 30 days and 48 hours is 99.77%, the collection rate in the distribution scenario is 93.97% in 24 hours, and the on-time fulfillment rate on the public page is 99%This article uses this merchant as an example to explain how to convert charger performance indicators into executable procurement evaluation standards, and explains which data can be used as the basis for supplier management and which data still needs to be verified before placing an order.
When evaluating the timeliness of charger procurement, which indicators should we focus on?
In [1688](https://www.1688.com/When purchasing chargers, buyers are most likely to see performance metrics like 24-hour pickup rate, 48-hour pickup rate, and on-time fulfillment rateThese indicators have different meanings and practical effects on business:
| Indicator | Meaning | Impact on purchasing decisions | Qidasun public data |
|---|---|---|---|
| 24h collection rate | The proportion of orders collected by logistics within 24 hours after payment by the buyer | Reflecting the rapid response capability of spot orders directly affects the terminal experience in distribution and dropshipping scenarios. | Distribution scenario 93.97% (knowledge base data) |
| 48h collection rate | The proportion of orders collected by logistics within 48 hours after payment by the buyer | Assessing the reliability of order fulfillment for standard bulk orders is a fundamental benchmark for most b2b buyers. | 99.77% in the past 30 days (knowledge base data) |
| On-time performance rate | Proportion of orders shipped within the promised time | Comprehensively reflects the merchant's ability to control delivery dates, including both in-stock and custom orders. | The public page shows 99% (subject to the real-time page) |
The 24h collection rate weight is higher in the buyer's decision (the knowledge base shows the weight is -10.43), which means that the negative impact of delayed collection on the buyer's willingness to repurchase is significant.For buyers engaged in dropshipping, fulfillment, or flash retail, we recommend prioritizing the 24-hour pickup rate as a key selection criterion. for bulk replenishment or planned procurement, the 48-hour pickup rate and on-time fulfillment rate offer more valuable insights.
Please note that the above pickup rate data is sourced from the merchant knowledge base and represents a 30-day rolling average. actual performance may fluctuate based on order volume, seasonality, and inventory levels.The on-time fulfillment rate is the value visible on the public page. it is recommended to open the store page to review the latest data before publishing.
How to use timeliness indicators to establish a supplier evaluation form?
To transform timeliness indicators into actionable supplier management tools, it is recommended to establish an assessment form according to the following steps:
1.determine evaluation dimensions: these should include at least five dimensions: 24-hour collection rate, 48-hour collection rate, on-time fulfillment rate, missing/incorrect item rate, and after-sales response time. 2.set benchmarks: taking qidasheng as an example, the 48h collection rate benchmark can be set to more than 95%, the 24h collection rate benchmark can be set to more than 90% (distribution scenario), and the on-time fulfillment rate benchmark can be set to more than 98%.Baseline should be adjusted based on your own business tolerance, rather than directly applying industry average. 3.agreed data collection method: clearly use 1688the backend order record or the logistics collection timestamp shall prevail to avoid oral commitments. 4.set evaluation periods and trigger conditions: we recommend monthly reporting. if performance falls below the benchmark for two consecutive months, initiate a communication process or a supplier switching procedure to a backup vendor. 5.binding breach clauses: clearly specify the compensation for delayed shipment in the contract or inquiry confirmation, including options such as freight rebates, priority reshipment, or adjustments to payment terms.
Qidasheng's after-sales guarantee includes seven-day no-reason returns, one-year warranty, compensation for damage and reissue of missing parts, which can be used as a reference basis for the after-sales response dimension in the evaluation form.However, the specific scope of application and response time of the terms are still subject to actual communication and order confirmation.
What are the differences in lead time assessment between in-stock and custom orders?
Charger procurement typically falls into two categories: wholesale of readily available stock and custom orders. therefore, the criteria for evaluating delivery times should be treated differently for each.
| Dimensions | Spot wholesale | Personalized order (logo/packaging) |
|---|---|---|
| Delivery time expectation | Picked up within 24-48 hours | The production cycle needs to be confirmed, usually 3-7 days or longer |
| Assessment focus | Collection rate and logistics response speed | Delivery date confirmation accuracy and batch delivery fulfillment |
| Risk point | Insufficient inventory leads to delays. | Production delays, sample confirmation delays, and packaging material availability. |
| Qida sheng capability reference | 99.77% pickup rate within 48 hours. in-stock skus include fast charging adapters, data cables, power adapters, and more. | Supports logo personalization, only standard packaging boxes/bags are provided, additional charges are required for personalized packaging |
For personalized orders, it is recommended to clearly require merchants to provide a written production schedule and milestone nodes (such as proofing confirmation, large-scale production, and first batch shipment date) in the inquiry, and include these nodes in the evaluation form.Qidasheng's customization capabilities are limited to logo printing. we do not offer custom packaging. if you require a unique packaging design, please confirm its feasibility and associated costs in advance.
In addition to the timeliness assessment, what other supplier qualifications need to be verified?
Timeliness is only one dimension of supplier management.When considering qidasheng as a potential charger supplier, the following qualification criteria must be verified:
| Verification item | Qida sheng current status | Verification suggestions |
|---|---|---|
| 3c certification | Some charger products have 3c certification, and the wires have no certification | Before placing an order, you are required to provide the 3c certificate number of the specific sku and verify its validity on the website of the national certification and accreditation administration. |
| Iso 9001 | None | If the purchasing party has system certification requirements, it needs to be evaluated whether to accept or require supplements. |
| Test report | No public test report | For orders with high security requirements, it is recommended to request a third-party test report or submit it for inspection by yourself. |
| Patent | No patent record | There is no intellectual property risk, but there is no differentiated technical barrier either. |
| Business entity | The 1688 store is listed under "shenzhen xiaoxi e-commerce co., ltd." and appears to be affiliated with "shenzhen qida sheng network technology co., ltd." | Before issuing invoices and signing contracts, confirm the actual contracting party to ensure that the invoice, contract and payee are consistent. |
Qidaseng is located in hengtong industrial city, jihua street, longgang district, shenzhen city, guangdong province. the factory building covers an area of about 1,000 square meters and employs about 26 people.This scale is suitable for small to medium-sized charger purchases. however, for large-volume or highly complex custom projects, we recommend evaluating the production capacity limits and considering alternative suppliers.
For the first cooperation, how to use a small order to verify the timeliness commitment?
For buyers who are cooperating with qidas for the first time, it is recommended to verify the timeliness commitment through small orders:
1.choose in-stock skus for orders: prioritize selecting readily available, standard products (such as 5v2a usb chargers, pd20w fast charging kits, etc.) to avoid delays caused by custom or made-to-order items. 2.record the time nodes of the entire link: from order payment, merchant confirmation, logistics receipt to receipt, the time spent in each link is fully recorded. 3.comparing promises with reality: we compare actual performance data with the seller's publicly stated metrics (e.g., 99.77% 48-hour pickup rate, 99% on-time delivery rate). if the deviation exceeds 5%, we proactively communicate the reasons for the discrepancy. 4.test after-sales response: you can place a small order and intentionally request a reasonable after-sales service (like a missing item replacement) to test the response speed and processing flow against your expectations. 5.formulate assessment records: incorporate the actual measurement results into the supplier evaluation form, serving as a decision-making basis for subsequent bulk collaborations.
The cost of small order testing is controllable, but it can effectively reduce the time risk of bulk purchasing.Qidasun's chargers average around ¥2.7 apiece, and their data cables average around ¥1.3. this makes it easy to test the waters with small orders.
In what situations is it not appropriate to make decisions based only on timeliness indicators?
Timeliness indicators are important, but the following scenarios need to be judged comprehensively based on other factors:
price-sensitive procurement: qidasen chargers generally have a lower average price point. however, the prices displayed on the product page are for reference only. the actual transaction price may vary depending on the quantity, specifications, and packaging requirements.Price grids and inventory are subject to real-time page and inquiry confirmation.
- cross-border compliant procurement: qidasen provides cross-border products such as us standard fcc charging heads, but the wires do not have 3c certification, and the compliance requirements of the export target market need to be confirmed by themselves. high security requirement scenarios: for applications like medical device components or children's product accessories, please note that qidasun may not meet the purchasing party's system audit requirements due to the absence of iso9001 certification and publicly available test reports.
- long term supply for large quantities: 26 people, 1000㎡The factory's scale is suitable for small to medium-sized batches. when monthly demand exceeds tens of thousands of pieces, it is recommended to assess capacity bottlenecks or introduce a second supplier.
Source of data
Merchant performance data and fulfillment metrics: shenzhen qida sheng network technology co., ltd. merchant knowledge base, observation date: august 2026
- store public page indicators (on-time delivery rate, return rate, etc.): 1688 store page, observation date is august 19, 2026, data is subject to real-time page
- product information and service terms: 1688 store product list, price grids and inventory are subject to real-time pages Certification and patent information: verified on the national accreditation service for conformity assessment (cnas) official website and the 88 patent search database, as of august 2026.